Municipal centre


2014 | Kuchl

Recognition – expert jury, Rosenheimer Holzbaupreis 2016
Recognition – ZV österreichischer Bauherrenpreis 2014
Recognition – Holzbaupreis Salzburg 2015

The main challenge of drafting this was combining the various functions (municipal office, commercial space and residences), with their required usage scenarios, into one building such that all usages are given equal consideration and a new centre/address for the location is created. The new municipal centre confidently fits into the surroundings and is recognisable as the “new town centre of the lumber community Kuchl” on the through road.

Usage space: 2,841 m2
Beginning of planning: November 2011
Completion: January 2014
Construction time: 16 months

Photos: Volker Wortmeyer