City square Radstadt


2006 | Radstadt

The goal was an atmospheric and large-scale urban solution that makes it possible to be flexible while making parts of the city centre variably and individually usable.

These areas are allocated to the surrounding development and thus highlight their value in the urban context. At the same time, they serve to divide the entire square without breaking it apart.

The entire area will be seen as one large square, and can be perceived as such.

Beginning of planning: Competition 2004
Construction time: 10 months
Completion: April 2006
Photos: Darren Penrose